Day 3 - the sheathing required some repair so that was done, and then the octagonal window to the right of the front door was removed. It was then reframed and sheathed . The brick under the first floor front window was also removed and the sheathing was covered in plastic. On Monday the front windows will be removed and replaced and they will continue to remove the siding from the rest of the house.

Day 2 - the brick was removed from the sides of the garage, and the siding was removed from the garage stalls and the second floor of the front of the house, and then the house wrap was put on. They covered over Rachel's window because they knew she was away at school.

Day One - the dumpster wasn't ordered on time so it didn't arrive until late afternoon, and not much work was done because of it. The exterior lights on the garage and next to the front door were removed.